Skip to main content

Credit Balance and Plan Limits

If an action is blocked, check both credits and plan limits.

Two independent controls​

  1. Usable credits: required for paid operations.
  2. Plan limits: monthly caps on some features by plan.

You can have credits remaining and still hit a plan-specific limit.

Where to check​

  • Account > Credit Usage for current balance and allowance
  • Pricing for plan entitlements and feature caps

Common blocked scenarios​

"Insufficient credits"​

  • Add purchased credits
  • Wait for monthly renewal
  • Reduce batch size

"Limit reached" on match features​

Starter plans include monthly caps for match operations. Upgrade plan if needed for higher throughput.

MCP blocked despite paid plan​

MCP also requires positive usable credits.

  1. Confirm credits remaining.
  2. Confirm plan limits for selected operation.
  3. Estimate batch cost.
  4. Run a small test batch first.